Files
Download Complete Bulletin (9.7 MB)
Publication Date
1999
Series Number
4352
Abstract
These notes and illustrations have been compiled to assist earthmovers in the construction of circular excavated earth tank dams, with pipe inlets. Construction techniques tend to evolve over time, so the methods described in this publication will not be definitive, but, they may improve efficiency of construction in the interim. Although the example used in these notes refers to 10,000 m3 dams, the construction techniques, using a bulldozer, described here equally apply to dams of any volume of similar design. Only dimensions will vary. earthmovers using a scarper together with a bulldozer should be able to extract useful information from these notes.
Number of Pages
18
ISSN
1326-415X
Keywords
Western Australia, Construction, Building construction, Dams, Site preparation.
Disciplines
Environmental Engineering
Recommended Citation
Babbington, T,
and
Addison, J S.
(1999), Practical hints for the layout and construction of 10,000 m3 circular dams. Department of Primary Industries and Regional Development, Western Australia, Perth. Bulletin 4352.
https://library.dpird.wa.gov.au/bulletins/259
Maps
Maps are not included as part of the complete document download. If this report contains a map, it will be available in the individual parts list below.
This file is 9.7 MB. Files over 3MB may be slow to open. For best results, right-click and select "save as..."
Comments
"It is recommended that these notes be used in conjunction with ... Dam design and for pastoral water supplies, Bulletin 4281"