Publication Date

6-2011

Series Number

367

Abstract

As a part of the environmental planning and approvals process, the state government was required to prepare Groundwater Management and Hydrodynamic Plans. These plans are to address potential issues of salinity and water quality that could result from the development of irrigated agriculture on the Weaber Plain. The Weaber Plain groundwater modelling report (KBR 2010a) identified several options to manage watertables and salinity

Production bores 10WP35PB and 10WP36PB were drilled in the palaeochannel on sites selected from the interpretation of airborne geophysics.

Number of Pages

47

Keywords

Weaber Plain, hydrogeological investigations, Aquifers, bore pumping

Disciplines

Agriculture | Hydrology | Natural Resources Management and Policy | Soil Science | Water Resource Management

This file is 4.0 MB. Files over 3MB may be slow to open. For best results, right-click and select "save as..."

Share

COinS